페이지 정보

본문
pre-installation phase requires careful planning to ensure a smooth delivery and installation.
Pre-Installation Phase
-------------------
Prior to the installation team arrives several preparation activities take place at the manufacturing facility. These comprise:
- Thorough inspections to guarantee the windows are free from damage and potential harm
- Packaging and protective measures to avoid harm during transportation
- Dispatch of installation materials, such as insulation, flashing, and sealants
- Coordination with the installation team to schedule the delivery and installation
---------------------------
Upon arrival, the installation team begins by conducting a site survey to assess the installation area. This involves:
- Calculating the opening and verifying it is exact
- Ensuring the surrounding areas are clear of debris and hazards
- Checking for any obstacles that may hinder the installation process
- Confirming the type of frame system being used to ensure correct fit
------------------------
Before the new window can be installed, the old window must be removed. This is usually done by:
- Easing the old window out of the frame using a gentle prying motion
- Disconnecting
- Removing potential flashing or sealants around the old window
- Preparation the frame for the new window
---------------------
The installation team then prepares the frame for the new window by:
- Clearing the area to ensure a smooth seal
- Installing flashing around the frame to avoid water ingress
- Applying primer or specialized coatings to the frame for sealing
- Applying a sealant or weather-tightening system around the frame
---------------------------
The new window is then carefully placed into the prepared frame. This involves:
- Confirming the window is properly aligned with the frame
- Using shims and wedges to compensate for балканкар potential irregularities
- Tapping the window gently into position to firmly fix it
- Tightening all screws or bolts to ensure a secure fit
----------------------------
Once the window is installed, the installation team conducts a series of checks and inspections to ensure the window is functioning as intended. This includes:
- Checking the window for correct operation and balance
- Inspecting the sealant and flashing for potential gaps or indications of compromise
- Checking for correct thermal efficiency and performance
- Documenting the installation process and keeping a record for future reference

댓글목록
등록된 댓글이 없습니다.